factory price small size biogas plant for cow pig farm biodigester biogas digester system tank bag generate power
Produktbeschreibung
Red Mud mebrane biogas digester bag
Install the 6m3 Red Mud mebrane biogas digester bag
Step 1: Preparing construction materials
Cement (grade above 325) 400kgs;
Sand: 1200KG;
Brick (53×115×240mm) 1300 pieces;
Φ 110MM PVC pipe 2PCS ( length 420mm )
Step 2 : Choosing location
The digester should be constructed nearby the lavatory or hoggery or cowshed.
The inside dimension of the 6 m³ digester is
Length : 4 meter Height : 1 meter width : 1.5 meter.
You'd better draw a rectangle which is 4 meters length and 1.5 meters width.
You will build brick wall along the line.
Step 3 Build the brick wall
Step 4 : Install the Inlet Pipe
When you building the brick wall, please pay attention to make the inlet pipe on the corrected position in advance. The length of the inlet pvc pipe is 420mm.
Step 4 : Install the Outlet Pipe
When you building the brick wall, please pay attention to make the inlet pipe on the corrected position in advance. The length of the inlet pvc pipe is 420mm.
Step 5 : connect the digester bag, tie up with the clamp.
Step 6 : Feed the digester be full with the organic slurry, the water level must be cover the inlet hole. It will produce biogas in 5 to 7 days and make the digester bag inflatbale.
We suppot long term wrranty for the red mud memrbane.
The Red Mud PVC Material is made of the fabric and the chemical coating. Fabric mainly uses high-strength industrial polyester mesh folder and glass fiber materials; coating materials are mainly PVC and Teflon. Polyester cover membrane is polyvinyl chloride (PVC) and polyethylene coated glass fiber PTFE (Teflon). Because of the red mud material, the red mud reinforced Material is good elasticity, anti-aging, good folding properties. Lifespan is around 10 years.
Please answer the questions and then we can send your the proposal for the red mud membrane floating cover biogas plant.
1. What’s the climate in your area ? and how long is winter?
Temperature is one of the main factors to effect the gas product rate of the digester.
When the temperature frops below 15 degrees celsius, the biogas plant stops working.
2. What’s kind of raw material to be treated by biogas plant?
1.Food waste 2. Green waste 3. Animal waste 4. Human waste
5.Bird waste 6. distillery waste water 7. Other
3. How much waste per day?
Please inform us the quantity of the waste per day. We could help you figure out the gas production from the waste per day. And then we suggest the volume of the digester tank.
4. What is the usage of the biogas for your project?
1. Cooking 2. Generating eletricity
3. Cooking and Generating eletricity 4. Other
For further details, you could contact with our manager.
Mr. Zhongjing Pan
Tel:+86-13316595245
Whatsapp: +86-13316595245
Skype: panzhongjing
Wechat: 13316595245
Lieferfähigkeit
Verpackung und Versand
- Vorlaufzeit:
- Hafen:
- Verpackungsdetails: