1200 Cubic Meters and 400m3 Gas Holder Capacity Biogas Plant/ Biogas Steel Cstr Digester
Produktbeschreibung
1200 Cubic Meters and 400m3 Gas Holder Capacity Biogas Plant/ Biogas Steel Cstr Digester
1, Double-membrane Gas Holder.
Mounted on top of tank as all-in-one solution of biogas production&storage,the outer&inner membranes of gas holder would be fixed tightly by stirrups around tank;
2, Stirring System.
It makes biomass complete contact with microorganism. Three types of stirring methods: Mechanically, Hydraulically and Gas. Among of them,mechanical agitator is the most popular, has three kinds of installation: Vertically,Inclined entering and side entering.
3, Pressure Protector.
To avoid damages for tank and gas holder resulting from too high or too low pressure inside tank;
4, Heating Coils.
Made of Stainless Steel in tube form,it spirals around inside wall of tank. Hot water from
CHP or boiler to be used for tank heating through heating coils.And water after heat exchanged would return to CHP or boiler,as a complete water circulation;
5, Three-phase Separator.
It is required for UASB/EGSB/IC types of digesters with feedstock of low solid content, to achieve separations of "gas", "liquid" and "solid";
6, Sensors, Monitoring Devices.
According to actual process requirements, liquid level sensor,temperature sensor,ph sensor,gas pressure sensor and leaking alarm can be installed or integrated into the PLC monitoring system together with biogas analyzer,flow meter etc;
7, Insulation Layer.
For projects located in cold area,heat insulation layer would be installed outside of tank,to keep warm and avoid heat leaking,to guarantee the fermentation temperature;
8, Ancillary Equipment:
Feeding system, discharge system, biogas output pipe, the center support, ladder, casing, manhole, lightning rod, electric control cabinet, blower. Etc.
Product Name | Biogas Plant |
Material: | Enamel Steel Panels |
Single Capacity: | 1200 Cubic Meters |
Reactor Type: | Cstr |
Feedstock: | Pig Manure & Vegetable Waste |
Hydraulic Retention Time: | 25 Days |
Temperature: | Mesophilic 32~37 Temperature |
"Best In Agnecy is trusted name in the trading industry specialized in
Environment Protection Projects"
We represent Famous Chinese companies and provide solutions to clients in African countries, The Middle East.
Our duty is to accompany clients in all stages of the projects, our main objective is the satisfaction of our customers and the realization of referential projects.
Lieferfähigkeit
Verpackung und Versand
- Vorlaufzeit:
- Hafen:
- Verpackungsdetails: